POP and stuff

8A is doing POP right now through Feb 8, our POP night. We will be working on curriculum in between POP days. 8B and 8C have been working on curriculum and will begin to work on POP Jan 31st in preparation for their POP night Feb 28.Some useful links- 2013 POP packet, Collection Bins examples, Popgirls power point, POPguys power point.

All three teams will finish 8.2 Westward expansion and 8.3.1 and 8.3.2 Slavery and the causes of the Civil War by the time we finish POP.

8.2.2- Florida notes and Florida Student, Indian Removal notes and Indian Removal Student, Gold Rush Notes and Gold Rush Student, Texas notes and Texas Student, War and Land notes and War and Land Student, 8.2 Vocabulary.

8.3.1Vocabulary

8.3.1Slavery Notes and Slavery Student

8.3.2 Causes Notes and Causes Student

8.3.2 Vocabulary